Large Final cooling Tunnel(Vertical)

Cooling Tunnel Series

Large Final cooling Tunnel(Vertical)
PARAMETER
FEATURES
Chocolate Cooling Tunnel Series
No. Product Running Speed Power  Weight Dimension
D1 Pre-cooling Tunnel(Horizontal) ≤12 mould/min 5.3 Kw 950.0 Kw 2.3m*1m*2.5m
D2 Final cooling Tunnel(Horizontal) ≤12 mould/min 15.2 Kw 2350.0 Kw 8.3m*1m*2.4m
D3 Pre-cooling Tunnel(Vertical) ≤12 mould/min 5.3 Kw 950.0 Kw 2.3m*1m*2.5m
D4 Final cooling Tunnel(Vertical) ≤12 mould/min 15.2 Kw 1850.0 Kw 6.3m*1m*2.4m
D5 Large Final cooling Tunnel(Vertical) ≤24 mould/min 27.5 Kw 3120.0 Kw 12.6m*1m*2.4m

 

 

Equipment Overview

The final cooling tunnel is applicable for product final cooling, which is featured by up-down translational motion, small covering area, energy saving of more than 30%, advanced equipment control system, visible display and easy operation.

Equipment Description

Final Cooling Tunnel [Type: LSD-4*132A]

  Up-down translational design;

  Mold quantity: 528 pcs;

  Energy-saving of more than 30%;

  Running speed: ≤20molds/min.;

  Water cooling or wind cooling;

  Auto start or stop due to machine failure;

  Small covering area.

hot key:high quality
Contact us today (We will not disclose your information,and contact you within 24 hours)
Your Name
Your Email*
code
Submit
Refill
Product Catalog
Products